-
1. Purpose of the S.T.P.
-
-
2. S.T.P. capacity with proposed extension (if any)
-
-
3. Time of operation of the S.T.P.
-
-
4. Method of sewage supply to the S.T.P.
-
-
5. Sewage flow fluctuation during the year (with regard to seasonal industries)
-
-
6. Sewage flow fluctuation during the day (with regard to daily shifting of labour), with a maximum flow per hour
-
-
7. Analysis of sewage water to be treated (as per sheet attached)
-
-
8. Purification grade required, in per cent BOD5 (COD) or suspended matter
-
-
9. Point of destination of treated water flow
-
-
Sludge disposal system required; give also proposed utilization of sludge from the
treatment process
-